活動板房因為獨特的優(yōu)勢被大量應(yīng)用,那么對于
濟(jì)南活動板房的設(shè)計應(yīng)該注意什么
Because of its unique advantages, the movable plank house is widely used. What should be paid attention to in the design of Jinan mobile board house
一、要注意防腐
1、 Pay attention to anticorrosion
活動板房一年四季要接受陽光風(fēng)雨,而且自然界中的氧氣還有水分會對活動板房造成腐蝕,尤其是空氣中的二氧化硫,腐蝕性更嚴(yán)重。因此在設(shè)計活動板房的時候要考慮防腐,目前防腐更主要的方法就是使用保護(hù)層,噴上防銹漆。
The movable plank house has to accept the sunshine and wind and rain all the year round, and the oxygen and moisture in the nature will cause corrosion to the prefabricated house, especially the sulfur dioxide in the air, which is more corrosive. Therefore, anticorrosion should be considered in the design of prefabricated house. At present, the main method of anti-corrosion is to use protective layer and spray antirust paint.
二、節(jié)點附近構(gòu)件的變化
2、 Change of components near nodes
在設(shè)計活動板房的時候還要考慮在節(jié)點附近構(gòu)件的變化,尤其是在一些主要的節(jié)點,不然會影響到整個活動房的結(jié)構(gòu),經(jīng)過一系列的研究表明更好的連接方式就是接近鉸接,這樣受力才比較均勻,而且也更加堅固。
In the design of prefabricated house, the change of components near the nodes should be considered, especially in some main joints, otherwise the structure of the whole movable house will be affected. After a series of studies, it is shown that the best connection method is close to the hinge joint, so that the stress is more uniform and stronger.
三、變形限制
3、 Deformation limitation
活動板房在實際的生產(chǎn)、運輸以及拆卸的過程中,肯定會發(fā)生變形之類的,變形之后如果我們沒有進(jìn)行檢測,之后再次安裝的就會出現(xiàn)問題,因此在設(shè)計的時候我們要規(guī)定能接受的變形限制,來保證結(jié)構(gòu)的。
In the process of actual production, transportation and dismantling, the movable plank house will certainly deform. If we do not carry out the inspection after deformation, problems will appear in the installation again. Therefore, when designing, we should first stipulate the acceptable deformation limit to ensure the safety of the structure.
四、注意安裝彩鋼房周邊環(huán)境
4、 Pay attention to the surrounding environment of color steel room
活動板房在安裝的時候要注意安裝的周邊環(huán)境是不是合適,如果有兩層要注意兩層之間需要進(jìn)行埋件焊接,安裝要根據(jù)設(shè)計要求來,不能出現(xiàn)漏焊或者假焊的情況。
During the installation of the prefabricated house, attention should be paid to whether the surrounding environment is suitable. If there are two floors, it is necessary to pay attention to the welding of embedded parts between the two layers. The installation should be based on the design requirements, and there should be no missing welding or false welding.
五、不能夠漏水
5、 It can't leak
如果是高空作業(yè),那安裝的時候一定需要戴裝置。做好防腐處理和排水處理,不能出現(xiàn)漏水的情況。
If it is high-altitude operation, it must wear safety devices when installing. Do a good job in anti-corrosion treatment and drainage treatment, no water leakage.