禹城彩鋼巖棉復(fù)合板的安裝方法如下:
The installation method of Yucheng color steel rock wool composite board is as follows:
1、 基層處理
1. Grassroots treatment
確認(rèn)待安裝處無(wú)灰塵、無(wú)油脂、無(wú)銹蝕、無(wú)松動(dòng)等,表面干燥,如有防潮防腐需求,可適當(dāng)采取涂層處理,找平層達(dá)到要求,基層驗(yàn)收合格。
Confirm that the installation site is free of dust, grease, rust, looseness, etc., and the surface is dry. If there is a need for moisture and corrosion prevention, appropriate coating treatment can be taken, and the leveling layer meets the requirements. The base acceptance is qualified.
2、 彈線控制和懸掛基準(zhǔn)線
2. Bounce line control and suspension reference line
根據(jù)建筑實(shí)際立面設(shè)計(jì)和外墻技術(shù)要求,彈出門(mén)窗水平線、垂直控制線和裝飾縫線等,在建筑外陰陽(yáng)角和其他適當(dāng)處懸掛垂直基準(zhǔn)線和水平線,以確保安裝平整度和垂直度符合施工要求。
According to the actual facade design and external wall technical requirements of the building, pop out horizontal lines, vertical control lines, and decorative stitching lines for doors and windows. Hang vertical reference lines and horizontal lines at the external corners and other appropriate locations of the building to ensure that the installation flatness and verticality meet the construction requirements.
3、鋪設(shè)施工
3. Laying construction
挑選合適的禹城彩鋼巖棉復(fù)合板,規(guī)格和外觀尺寸偏差均在規(guī)定范圍內(nèi),裁剪下料后,按設(shè)計(jì)要求選擇復(fù)合板橫向還是豎向布置(注意橫向布置時(shí)每塊板兩個(gè)卡件,豎向布置時(shí)板上下左右各一個(gè)卡件),并用膨脹螺栓錨卡件進(jìn)行固定,拼縫大小符合施工要求,板和氈的接頭對(duì)接一定要十分緊密,在多層保溫時(shí)各十字接縫應(yīng)交錯(cuò)分開(kāi),避免形成熱橋和冷橋。
Select suitable Yucheng color steel rock wool composite panels, with specifications and appearance size deviations within the specified range. After cutting and cutting, choose whether to arrange the composite panels horizontally or vertically according to the design requirements (note that each panel should have two clips for horizontal layout, and one clip for each top, bottom, left, and right of the panel for vertical layout), and fix them with expansion bolts and anchor clips. The joint size should meet the construction requirements, and the joint between the panel and felt must be very tight. In multi-layer insulation, the cross joints should be staggered and separated to avoid the formation of hot and cold bridges.
4、 涂抹膠粘劑
4. Apply adhesive
按比例要求配制禹城彩鋼巖棉復(fù)合板專用膠粘劑,充分?jǐn)嚢韬蟮哪z粘劑應(yīng)色澤均勻、新鮮良好、稠度適宜,粘度要達(dá)到使剛粘貼上的巖棉板不會(huì)下垂。將配制好的膠粘劑按規(guī)定厚度,均勻地涂抹在巖棉板上,可采用條形點(diǎn)粘方式進(jìn)行粘接,以確保牢固可靠。
Prepare the special adhesive for Yucheng color steel rock wool composite board according to the proportion requirements. After thorough mixing, the adhesive should have a uniform color, fresh and good consistency, and the viscosity should be sufficient to prevent the newly pasted rock wool board from sagging. Apply the prepared adhesive evenly to the rock wool board according to the specified thickness, and use a strip point bonding method to ensure firmness and reliability.
本文由 禹城彩鋼復(fù)合板 友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊 http://nhmmgs.com 真誠(chéng)的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.
This article is a friendly contribution from Yucheng Color Steel Composite Panel. For more related knowledge, please click http://nhmmgs.com Sincere attitude. We provide you with comprehensive services. We will gradually contribute more relevant knowledge to everyone. Please stay tuned
聯(lián)系電話:18765446878
咨詢熱線:18765446878(微信同號(hào))
地址:禹城市十里望鎮(zhèn)山東國(guó)際商貿(mào)港往南660米
備案號(hào):魯ICP備2023024436號(hào) 魯公網(wǎng)安備37010202001695號(hào) 網(wǎng)站地圖|XML|TXT
微信二維碼