濟(jì)南工程板房安裝要注意的地方不多,但要所有的安裝人員落實到工作上就需要規(guī)范性的措施了,如下:
There are not many points to be paid attention to in the installation of prefabricated houses in Jinan Project, but normative measures are needed to implement the work of all installers, as follows:
①工程板房墻板安裝前應(yīng)檢查復(fù)核柱、墻梁安裝正確、牢固、平整;
① Check and recheck the correct, firm and flat installation of columns and wall beams before the installation of wall panels in the prefabricated house;
②板房的金屬面夾芯板墻板的豎向拼縫宜采用企口縫或工字鋁拼接,拼縫處應(yīng)打上密封膠;
② The vertical seam of the metal face sandwich panel wallboard of the plank house should be spliced with tongued and grooved seams or I-shaped aluminum, and the seam should be sealed with sealant;
③建筑工程板房的金屬面夾芯板與地梁、墻梁或樓面次桁架的連接應(yīng)使用螺栓連接,連接螺栓橫向間距應(yīng)不大于500mm(每塊板寬度方向設(shè)置不少于兩個螺栓);
③ The connection between the metal sandwich panel and the ground beam, wall beam or floor sub-truss of the building engineering plank house shall be connected by bolts, and the transverse spacing of the connecting bolts shall not be greater than 500mm (at least two bolts shall be set in the width direction of each plate);
④工程板房嵌入式墻板安裝應(yīng)在冷彎薄壁型鋼結(jié)構(gòu)安裝時及時鑲?cè)酥觾蓚?cè)槽內(nèi),嵌入式墻板的上下搭接縫應(yīng)采用企口縫,外側(cè)面板應(yīng)向下搭接,搭接長度應(yīng)不小于15mm。
④ The installation of the embedded wallboard of the engineering plank house shall be inserted into the slots on both sides of the column in time when the cold-formed thin-walled steel structure is installed. The upper and lower lap joints of the embedded wallboard shall be tongued and grooved, and the outer panel shall be overlapped downward, with the lap length not less than 15mm.
工程板房與建樓房差不多,就是將四周及隔墻基礎(chǔ)找平,建筑工程板房基礎(chǔ)好用鋼筋混凝土,也可選用墻磚頭砌,比較結(jié)實;然后立柱子,用橫向梁將骨架連起來,上隔板、外墻板與門窗框;接著安裝樓板檁條,安裝樓梯,鋪地板,再向上安上一層,然后上屋架和屋面板;后安裝門窗等,拉豎向支撐,還有就是衛(wèi)生潔具、小五金之類的。
The engineering plank house is similar to the building building, which is to level the surrounding and partition foundation. The foundation of the engineering plank house can be made of reinforced concrete or wall brick, which is relatively solid; Then erect the column, connect the framework with the transverse beam, and install the upper partition, the outer wall panel and the door and window frame; Then install the floor purlin, install the stairs, lay the floor, and then install a layer up, and then install the roof truss and roof panel; After that, install doors and windows, pull vertical supports, and sanitary ware and hardware.
工程板房還有一個很重要的就是“隱蔽工程”,可分為水安裝、電安裝及防潮、防水等項目,其中的每一個項目都不容忽視,如果哪一個環(huán)節(jié)出了問題,都可能會影響板房的正常使用,嚴(yán)重的會有隱患,所以防水工程的施工工藝和優(yōu)良材料的選擇,可以避免不必要的經(jīng)濟(jì)損失和傷害。更多相關(guān)內(nèi)容就來我們網(wǎng)站
http://nhmmgs.com咨詢吧!
There is also a very important "hidden project" in the engineering plank house, which can be divided into water installation, electricity installation, moisture-proof, waterproof and other projects. Each of these projects can not be ignored. If any link goes wrong, it may affect the normal use of the plank house, and there will be serious potential safety hazards. Therefore, the construction process of waterproof engineering and the selection of excellent materials can avoid unnecessary economic losses and injuries. Come to our website for more relevant content http://nhmmgs.com Ask!