以前的工地,是雜亂的,隨便搭幾個(gè)帳篷或其他臨時(shí)住房然后工人住,但現(xiàn)在不同了,用過活動(dòng)板房后,就變漂亮了。下面主要來認(rèn)識認(rèn)識
濟(jì)南彩鋼板房地基的步處理工藝!
In the past, the construction site was messy, and the workers lived in a few tents or other temporary houses, but now it is different. After using the prefabricated house, it becomes beautiful. The following is mainly to understand the step treatment process of Jinan color steel plate house foundation!
1.先要進(jìn)行硬度測試,特殊的地形和地基的硬度對建造活動(dòng)板房來說有較大的差別,應(yīng)當(dāng)作一個(gè)特殊的處理,保證鋼結(jié)構(gòu)設(shè)計(jì)活動(dòng)板房可以更加順利通過安裝,確保其質(zhì)量,技術(shù)管理人員我們應(yīng)該提前學(xué)習(xí)進(jìn)行分析測量。
1. The hardness test should be carried out first. The special terrain and the hardness of the foundation have a great difference to the construction of the prefabricated house. A special treatment should be made to ensure that the prefabricated house of the steel structure design can pass the installation more smoothly and ensure its quality. The technical management personnel should learn to analyze and measure in advance.
2.基礎(chǔ)測量完成后,接下來是基礎(chǔ)澆筑,這一次的是須先測量好水平,澆筑完成后,應(yīng)控制水平誤差在10毫米以內(nèi)。須要保證經(jīng)濟(jì)基礎(chǔ)面水平在誤差以內(nèi),這樣才不會(huì)產(chǎn)生影響企業(yè)后續(xù)的工作發(fā)展進(jìn)程。
2. After the foundation measurement is completed, the next step is the foundation pouring. This time, the key point is to measure the level first. After the pouring is completed, the horizontal error should be controlled within 10 mm. It is necessary to ensure that the level of the economic base is within the error, so as not to affect the subsequent development process of the enterprise.
3.混凝土標(biāo)號,一般這種情況下發(fā)展基礎(chǔ)為c20且內(nèi)無鋼筋,當(dāng)然,在特殊的地形或者通過其他企業(yè)不可抗拒的條件下,應(yīng)當(dāng)可以根據(jù)信息技術(shù)管理人員的測定來頂下終方案。
3. The concrete grade is generally based on c20 and there is no reinforcement in it. Of course, in the special terrain or under the irresistible conditions of other enterprises, the final scheme can be determined according to the determination of information technology management personnel.
4.澆注時(shí)間,跟常規(guī)的混凝土澆筑施工工藝技術(shù)一樣,鋼結(jié)構(gòu)設(shè)計(jì)活動(dòng)板房同樣不可以減少生產(chǎn)工藝分析程序,基礎(chǔ)澆筑完成后或者社會(huì)活動(dòng)板房安裝之前教師應(yīng)該留充分的時(shí)間讓混凝土可以達(dá)到硬度要求。
4. Pouring time: like the conventional concrete pouring construction technology, the steel structure design movable plank house can not reduce the production process analysis procedure. After the foundation pouring is completed or before the installation of the social movable plank house, the teacher should leave sufficient time for the concrete to meet the hardness requirements.
5.澆筑,制作技術(shù)基礎(chǔ)的同時(shí),須跟室內(nèi)地面一起進(jìn)行澆筑完成,水平具有高度跟基礎(chǔ)教育一樣,這樣一個(gè)可以通過確保安裝工期、質(zhì)量管理以及安裝后的美觀?;顒?dòng)結(jié)構(gòu)板房安裝環(huán)境好了自己以后,在室內(nèi)鋪地板,這樣既方便又整潔。
5. Pouring, while making the technical foundation, must be completed together with the indoor floor. The level is the same as the basic education. Such a method can ensure the installation period, quality management and the beauty after installation. After the installation environment of the movable structure plank house is improved, the floor shall be paved indoors, which is convenient and clean.
另外,室內(nèi)地板的水平高度應(yīng)該比基礎(chǔ)水平高出50mm,保證雨水不會(huì)流入室內(nèi)以及保證地圈梁的牢固程度。
In addition, the horizontal height of the indoor floor should be 50 mm higher than the foundation level to ensure that the rainwater will not flow into the room and the firmness of the ground ring beam.
預(yù)制房屋的主要骨架是鋼結(jié)構(gòu),但其基礎(chǔ)卻不是鋼結(jié)構(gòu)?;A(chǔ)大部分是混凝土結(jié)構(gòu),彩鋼板房對基礎(chǔ)硬度有一定的要求,基礎(chǔ)硬度決定了是否做特殊處理,對工程奠定基礎(chǔ)關(guān)重要。以上所講解內(nèi)容您有不明白的,就來我們網(wǎng)站
http://nhmmgs.com關(guān)注咨詢吧!
The main skeleton of prefabricated houses is steel structure, but its foundation is not steel structure. Most of the foundations are concrete structures. Color steel plank houses have certain requirements for the foundation hardness. The foundation hardness determines whether to do special treatment, which is very important to lay the foundation for the project. If you don't understand the above, please come to our website http://nhmmgs.com Pay attention to consultation!