濟南工程板房的基礎(chǔ)與任何建筑一樣,基礎(chǔ)決定上層建筑,符合標(biāo)準(zhǔn)的基礎(chǔ)能夠保證板房使用期間的性和舒適度。因此,臨建板房的基礎(chǔ)一定要符合板房的標(biāo)準(zhǔn)。
The foundation of the engineering plank house is the same as any building. The foundation determines the superstructure. The standard foundation can ensure the safety and comfort of the plank house during its use. Therefore, the foundation of temporary plank house must conform to the standard of plank house.
板房(T型板房)要求條型基礎(chǔ)400*400mm,且同時須要做好地坪,地坪和基礎(chǔ)一樣水平,即為平板基礎(chǔ);而標(biāo)準(zhǔn)板房(K型板房)只要先做好條型基礎(chǔ)300*300mm就可以安裝板房了
The plank house (T-shaped plank house) requires a strip foundation of 400 * 400mm, and at the same time, the floor must be well prepared. The floor is the same level as the foundation, that is, the slab foundation; The standard plank house (K-type plank house) can be installed as long as the strip foundation of 300 * 300mm is completed first
根據(jù)場地條件和條型基礎(chǔ)圖紙,釘好基礎(chǔ)模板,再用普通混凝土澆灌,并保持基礎(chǔ)面水平,如果場地為回填土,則需夯實和鋪墊層,并視場地情況可放幾根鋼筋,以保證基礎(chǔ)整體在板房使用期間不會下沉。
According to the site conditions and strip foundation drawings, the foundation formwork shall be nailed first, then ordinary concrete shall be used for pouring, and the foundation surface shall be kept horizontal. If the site is backfilled, it shall be tamped and paved, and several reinforcements can be placed according to the site conditions to ensure that the foundation will not sink during the use of the plank house as a whole.
濟南工程板房
安裝K房后,再做室內(nèi)地坪,這樣可憑隔墻板底端和地梁確定地坪的厚度,只要地坪比地梁高,雨水就不會滲進板房室內(nèi),如果安裝K房提供平板基礎(chǔ)就有可能雨水倒流,導(dǎo)致室內(nèi)漏水。
After the installation of room K, the indoor floor shall be made, so that the thickness of the floor can be determined by the bottom of the partition board and the floor beam. As long as the floor is higher than the floor beam, the rainwater will not penetrate into the room. If the installation of room K provides a flat foundation, the rainwater may flow back, causing indoor water leakage.
注意,安裝板房須要做條型基礎(chǔ)400*400mm,并且同時要做好地坪;若不同時做好地坪,會影響板房的安裝質(zhì)量,所以板房的安裝基礎(chǔ)要求,須是基礎(chǔ)和地坪同時做好。
Note that the strip foundation 400 * 400mm shall be made for the installation of plank house, and the floor shall be prepared at the same time; If the floor is not prepared at the same time, the installation quality of the plank house will be affected. Therefore, the installation foundation of the plank house must be prepared at the same time with the floor.
工程板房的基礎(chǔ)到底怎么做才標(biāo)準(zhǔn)?以上所講解的內(nèi)容您可以作為參考使用,更多相關(guān)事項就來我們的網(wǎng)站http://nhmmgs.com咨詢吧!
What is the standard for the foundation of engineering plank house? The above contents can be used as reference, and more related matters can be found on our website http://nhmmgs.com Consult!

聯(lián)系電話:18765446878

咨詢熱線:18765446878(微信同號)

地址:禹城市十里望鎮(zhèn)山東國際商貿(mào)港往南660米

備案號:魯ICP備2023024436號 魯公網(wǎng)安備37010202001695號 網(wǎng)站地圖|XML|TXT

微信二維碼

微信二維碼

欧美自拍系列精品在线| 熟女中文字幕一区二区三区| 老外那个很粗大做起来很爽| 免费午夜福利不卡片在线 视频| 久久99青青精品免费| 亚洲综合精品天堂夜夜| 欧美人妻一区二区三区| 亚洲中文字幕乱码亚洲| 亚洲一级在线免费观看| 亚洲一区二区三区一区| 亚洲欧美日本成人在线| 久久黄片免费播放大全| 久久人人爽人人爽大片av| 欧美一级不卡视频在线观看| 久久精品亚洲欧美日韩| 日韩免费国产91在线| 国产日韩中文视频一区| 九九热国产这里只有精品| 亚洲中文在线男人的天堂| 99久久成人精品国产免费| 欧美精品一区二区水蜜桃| 香蕉网尹人综合在线观看| 国产在线观看不卡一区二区| 日韩精品成区中文字幕| 91在线爽的少妇嗷嗷叫| 91精品国产av一区二区| 国产又大又黄又粗的黄色| 免费精品国产日韩热久久| 亚洲丁香婷婷久久一区| 91欧美日韩国产在线观看| 视频在线播放你懂的一区| 国产毛片对白精品看片| 免费在线成人午夜视频| 丁香六月婷婷基地伊人| 日韩精品一区二区三区av在线| 日本欧美视频在线观看免费| 国产成人精品午夜福利| 欧美丰满人妻少妇精品| 日本午夜一本久久久综合| 欧美一本在线免费观看| 国产黑人一区二区三区|