彩鋼房是一種以輕鋼H型鋼、槽鋼為骨架,以夾芯板為墻板材料,以標(biāo)準(zhǔn)模數(shù)系列進(jìn)行空間組合,構(gòu)件采用螺栓連接或焊接,全新概念的經(jīng)濟(jì)型房屋。那么您知道彩鋼房雨季施工注意事項(xiàng)是什么嗎?
濟(jì)南彩鋼廠家為您講解。
The color steel house is an environmentally friendly and economical house with light steel H-shaped steel and channel steel as the framework, sandwich panel as the wall panel material, standard module series for spatial combination, and bolt connection or welding as the components. Do you know the precautions for construction of color steel house in rainy season? Jinan color steel factory will explain it to you.
1.彩鋼板房雨季施工要在周圍放置條石以阻撓土方被雨水沖刷開挖好的基槽或管溝內(nèi),止人工降水(排水)時(shí),應(yīng)驗(yàn)算箱形根底抗浮安穩(wěn)性、地下水對(duì)根底的浮力?;蛟S沉沒已竣工的一些根底構(gòu)筑。根底施工結(jié)束,應(yīng)抓住進(jìn)行基坑附近回填作業(yè)。停關(guān)于堆積在施工現(xiàn)場的土方,應(yīng)在附近做好避免雨水沖刷的辦法。
1. During the construction of color steel slab houses in rainy season, strip stones shall be placed around them to prevent the earth from being washed by rain into the excavated foundation trench or pipe trench. When artificial precipitation (drainage) is stopped, the anti floating stability of box shaped foundation and the buoyancy of groundwater to the foundation shall be checked and calculated. Perhaps some basic structures that have been completed should be sunk. After the foundation construction is completed, the backfilling near the foundation pit shall be carried out. For the earthwork accumulated on the construction site, measures shall be taken nearby to avoid rain erosion.
2.必要時(shí)可適當(dāng)放緩邊斜度或設(shè)置支持。鋼結(jié)構(gòu)工程施工時(shí)應(yīng)加強(qiáng)對(duì)邊坡和支持的查看操控。雨期開挖基槽(坑)或管溝時(shí),應(yīng)留意邊坡安穩(wěn)。關(guān)于已開挖好的基槽(坑)或管溝要設(shè)置支持。如預(yù)先思考不周,澆搗后,遇有大雨時(shí),往往會(huì)構(gòu)成地下室和池子上浮的事端。
2. If necessary, the edge slope can be slowed down or support can be set. During the construction of steel structure works, the inspection and control of slope and support shall be strengthened. When excavating foundation trench (PIT) or pipe trench in rainy season, pay attention to the stability of slope. Support shall be provided for the excavated foundation trench (PIT) or pipe trench. If you do not think carefully in advance, when there is heavy rain after pouring and tamping, it will often cause the basement and pool to float up.
3.應(yīng)逐段、逐片的分期完結(jié),雨量大時(shí),應(yīng)中止大面積的土方施工。根底挖到標(biāo)高后,雨期施工鋼結(jié)構(gòu)廠房作業(yè)面不宜過大,及時(shí)檢驗(yàn)并澆筑混土層。
3. It shall be completed by stages section by section and piece by piece. In case of heavy rainfall, large-area earthwork construction shall be suspended. After the foundation bottom is excavated to the elevation, the working surface of the steel structure plant in rainy season shall not be too large, and the concrete layer shall be inspected and poured in time.
4.如被雨水浸泡后的根底,應(yīng)做必要的挖方回填等康復(fù)根底承載力的作業(yè)。主要的或特別工程應(yīng)在雨期前完結(jié)任務(wù)。對(duì)雨前回填的土方,應(yīng)及時(shí)進(jìn)行碾壓并使其外表構(gòu)成必定的斜度,以便雨水能主動(dòng)排出。
4. If the root is soaked by rain, necessary excavation and backfilling shall be done to restore the bearing capacity of the root. Major or special works shall be completed before the rainy season. The earthwork backfilled before the rain shall be rolled in time to form a certain slope on the surface so that the rain water can be discharged actively.
5.為避免基坑浸泡,開挖時(shí)要在基坑內(nèi)作好排水溝、集水井并安排必要的排水力氣。坐落底下的池子和地下室,施工時(shí)應(yīng)思考周到。
5. In order to avoid foundation pit soaking, drainage ditches and water collecting wells shall be built in the foundation pit during excavation and necessary drainage force shall be arranged. The pool and basement under the building should be carefully considered during construction.
6.避免邊坡被雨水沖塌,可在邊坡上加釘鋼絲網(wǎng)片,并抹上50cm細(xì)石混凝土。也可用塑料布隱瞞邊坡。
6. To prevent the slope from being washed down by rain, steel wire mesh can be nailed on the slope and 50cm fine aggregate concrete can be plastered. Plastic cloth can also be used to hide the slope.
彩鋼房可方便快捷地進(jìn)行組裝和拆卸,實(shí)現(xiàn)了臨時(shí)建筑的通用標(biāo)準(zhǔn)化,樹立了、快捷的建筑理念,您有需求就來我們網(wǎng)站
http://nhmmgs.com進(jìn)行咨詢了解吧。
The color steel room can be easily and quickly assembled and disassembled, realizing the general standardization of temporary buildings, and establishing the building concept of environmental protection, energy saving, fast and efficient. Come to our website if you need http://nhmmgs.com Consult and understand.