活動板房安裝必須具有在技術(shù)監(jiān)督備案才能進行施工,并且活動板房的生產(chǎn)企業(yè),應(yīng)提供完整的建筑結(jié)構(gòu)安裝圖紙、產(chǎn)品出廠合格證、材質(zhì)證明及檢測報告、使用說明書、相關(guān)驗收標準等。那么
濟南工程板房搭建有哪些施工要求?
The installation of prefabricated house must be put on the record of technical supervision before construction, and the manufacturer of prefabricated house shall provide complete building structure installation drawings, product ex factory certificate, material certificate and test report, operation instruction and relevant acceptance standards. What are the construction requirements for the construction of slab house in Jinan?
濟南工程板房搭建施工要求
Construction requirements of slab house construction in Jinan project
(1)活動板房安裝,應(yīng)由具有相應(yīng)資質(zhì)的施工企業(yè)、或生產(chǎn)廠家承擔。安裝單位應(yīng)根據(jù)合同文件、安裝圖紙以及相關(guān)標準編制安裝施工方案,并按方案組織實施。
(1) The installation of prefabricated houses shall be undertaken by construction enterprises or manufacturers with corresponding qualifications. The installation unit shall prepare the installation construction scheme according to the contract documents, installation drawings and relevant standards, and organize the implementation according to the scheme.
(2)活動板房層數(shù)更多不應(yīng)超過2層,每層建筑面積不應(yīng)超過300㎡,并且大于200㎡時,其疏散樓梯的數(shù)量不應(yīng)少于2部。
(2) The number of floors of prefabricated house shall not exceed 2, and the building area of each floor shall not exceed 300 m2. When the floor area is more than 200 m2, the number of evacuation stairs shall not be less than 2.
房間門樓梯的距離不應(yīng)大于25m,樓梯的凈寬不應(yīng)小于1.1m。宿舍房間的建筑面積不應(yīng)大于30㎡,房間門應(yīng)朝疏散方向開啟。
The maximum distance between the room door and the stairs should not be greater than 25m, and the clear width of the stairs should not be less than 1.1m. The building area of the dormitory room should not be greater than 30 m2, and the room door should be opened towards the evacuation direction.
(3)活動板房安裝完成后,應(yīng)由安裝單位進行自檢,經(jīng)自檢合格后應(yīng)由施工總承包單位組織監(jiān)理單位、使用單位、安裝單位進行聯(lián)合驗收,合格后方可交付使用。
(3) After the installation of prefabricated house is completed, the installation unit shall carry out self inspection. After passing the self inspection, the general contractor shall organize the supervision unit, the user and the installation unit to carry out joint acceptance, and the house can be delivered for use only after it is qualified.
以上就是
濟南工程板房搭建有哪些施工的全部內(nèi)容了,如果你還有關(guān)于濟南工程板房的問題,請咨詢在線客服,或者直接致電咨詢!
The above is the whole content of Jinan project board room construction, if you have any questions about Jinan project board room, please consult online customer service, or call directly for consultation!